+/v8APAAh-DOCTYPE HTML PUBLIC +ACI--//W3C//DTD HTML 4.0 Transitional//EN+ACIAPg- +ADw-HTML+AD4APA-HEAD+AD4- +ADw-META http-equiv+AD0-Content-Type content+AD0AIg-text/html+ADs- charset+AD0-utf-7+ACIAPg- +ADw-META content+AD0AIg-MSHTML 6.00.6000.16705+ACI- name+AD0-GENERATOR+AD4APA-/HEAD+AD4- +ADw-BODY+AD4APA-B+AD4-From:+ADw-/B+AD4- Ron Buck +AFs-rbuck+AEA-TEI-NET.com+AF0APA-BR+AD4APA-B+AD4-Sent:+ADw-/B+AD4- Monday, September 22, 2008 12:18 PM+ADw-BR+AD4APA-B+AD4-To:+ADw-/B+AD4- bweber+AEA-swri.edu+ADs- Bob.Campbell+AEA-AftonChemical.com+ADs- greg.shank+AEA-volvo.com+ADs- Jeff Clark+ADs- jrh+AEA-lubrizol.com+ADs- James.Gutzwiller+AEA-infineum.com+ADs- James.Matasic+AEA-Lubrizol.com+ADs- jim.moritz+AEA-intertek.com+ADs- jaru+AEA-chevrontexaco.com+ADs- MAWC+AEA-chevrontexaco.com+ADs- riccardo.conti+AEA-exxonmobil.com+ADs- kenneth.goshorn+AEA-volvo.com+ADs- BCGW+AEA-chevron.com+ADw-BR+AD4APA-B+AD4-Subject:+ADw-/B+AD4- Minutes of September 19 2008 Mack SP Teleconference+ADw-BR+AD4- +ADw-P+AD4APA-FONT face+AD0-Arial+AD4APA-FONT size+AD0-2+AD4-Attendance - Mark Cooper, Jeff Clark, Jim Rutherford, Jim Moritz, Bob Campbell, Ron Buck,+ACY-nbsp+ADs-Greg Shank, Jim Matasic, Jess Hamilton, Jim Gutzwiller+ADw-SPAN class+AD0-608432415-22092008+AD4-, Brad Carter, Riccardo Conti, Ben Weber+ADw-/SPAN+AD4APA-/FONT+AD4APA-/FONT+AD4APA-/P+AD4- +ADw-P+AD4APA-FONT face+AD0-Arial+AD4APA-FONT size+AD0-2+AD4APA-U+AD4-T-12 Reference Status Update:+ADw-/U+AD4AJg-nbsp+ADsAPA-BR+AD4APA-SPAN class+AD0-608432415-22092008+AD4-ExxonMobil has engine built and will start week of September 22. Lubrizol is running (+AH4- 130 test hours). Intertek is running (+AH4-150 hours). This test missed the soot window and may be terminated. Further discussion to follow.+ADw-/SPAN+AD4APA-/FONT+AD4APA-/FONT+AD4APA-/P+AD4- +ADw-P+AD4APA-FONT face+AD0-Arial+AD4APA-FONT size+AD0-2+AD4APA-U+AD4-Old Ring Batch Availability:+ADw-/U+AD4AJg-nbsp+ADsAPA-BR+AD4APA-/FONT+AD4APA-/FONT+AD4APA-FONT face+AD0-Arial+AD4APA-FONT size+AD0-2+AD4APA-SPAN class+AD0-608432415-22092008+AD4-Mark asked if there were any changes to+ACY-nbsp+ADs-the old ring batch availability. Based on responses received it appears there are still two sets that could be made available for split tests.+ACY-nbsp+ADsAPA-/SPAN+AD4AJg-nbsp+ADsAPA-SPAN class+AD0-608432415-22092008+AD4-During this discussion there was a suggestion to retain these ring sets for possible use for T11 testing due to the oil consumption/wear issue in the T11. There were further discussions on the T11 in regards to current oil consumption trends and possibly having a new batch made for a 5 year supply. Based upon historical usage at TEI that would be +AH4- 100 builds worth of rings. It was decided to discuss this topic further at the next teleconference.+ADw-/SPAN+AD4APA-/FONT+AD4APA-/FONT+AD4APA-/P+AD4- +ADw-P+AD4APA-FONT face+AD0-Arial+AD4APA-FONT size+AD0-2+AD4APA-U+AD4-Split+ACY-nbsp+ADsAPA-SPAN class+AD0-608432415-22092008+AD4-Ring +ADw-/SPAN+AD4-Test+ADw-SPAN class+AD0-608432415-22092008+AD4-ing+ADw-/SPAN+AD4AJg-nbsp+ADs-:+ADw-/U+AD4APA-SPAN class+AD0-608432415-22092008+AD4AJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADs-+ACY-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADs- +ADw-/SPAN+AD4APA-SPAN class+AD0-608432415-22092008+AD4-Greg reported that he may have one commitment to run a split ring test with no firm date on when that might complete. Concerns were raised about having to wait to include that information in deciding+ACY-nbsp+ADs-possible correction factor. There were additional concerns raised about mandatory use. After significant discussions the following motion was made by Greg and seconded by Riccardo:+ADw-/SPAN+AD4APA-/FONT+AD4APA-/FONT+AD4APA-/P+AD4- +ADw-P+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-/SPAN+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-/SPAN+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4AIgA8-SPAN class+AD0-608432415-22092008+AD4-Allow voluntary split ring testing on the T12 using the configuration proposed by Jim Rutherford at the last teleconference. Effective date is September 19, 2008. This data may be used in conjunction with the reference test results if available at the time of data analysis+ACI-. The motion passed 6 for, 0 against, 4 waive+ADw-/SPAN+AD4APA-/FONT+AD4APA-/P+AD4- +ADw-P+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-U+AD4-Intertek T12 Calibration Test:+ADw-/U+AD4AJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADs-+ACY-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADsAJg-nbsp+ADs- Prior to the teleconference Jim had sent out some information regarding his current calibration+ACY-nbsp+ADs-test. The test was outside the soot window target at+ADw-/SPAN+AD4APA-/FONT+AD4APA-FONT size+AD0AKw-0+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4APA-SPAN class+AD0-608432415-22092008+AD4AJg-nbsp+ADs-100 hours. He planned to terminate the test unless there was a chance the data could be accepted for use in the analysis and the run possibly used for calibration. Under the current rules the test would not be accepted due to missing the soot target but the panel has the option of opening up the target window as long as it is applied equally across all tests. After much discussion on the value of the data and how to include the data Jim said he would continue the test to completion.+ADw-/SPAN+AD4APA-/FONT+AD4APA-/FONT+AD4APA-/P+AD4- +ADw-P+AD4APA-FONT size+AD0AKw-0+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4APA-SPAN class+AD0-608432415-22092008+AD4-The next teleconference is tentatively set for September 30 at 10:30 am eastern. A face to face meeting is still planned for some time in October after all calibration tests have completed.+ADw-/SPAN+AD4APA-/FONT+AD4APA-/FONT+AD4APA-/P+AD4- +ADw-DIV+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4APA-/FONT+AD4APA-/SPAN+AD4AJg-nbsp+ADsAPA-/DIV+AD4- +ADw-DIV+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4-Please let me know of any corrections that need to be made.+ADw-/FONT+AD4APA-/SPAN+AD4APA-/DIV+AD4- +ADw-DIV+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4APA-/FONT+AD4APA-/SPAN+AD4AJg-nbsp+ADsAPA-/DIV+AD4- +ADw-DIV+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4-Regards,+ADw-/FONT+AD4APA-/SPAN+AD4APA-/DIV+AD4- +ADw-DIV+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4APA-/FONT+AD4APA-/SPAN+AD4AJg-nbsp+ADsAPA-/DIV+AD4- +ADw-DIV+AD4APA-SPAN class+AD0-608432415-22092008+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4-Ron+ADw-/FONT+AD4APA-/SPAN+AD4APA-/DIV+AD4- +ADw-DIV+AD4APA-BR+AD4APA-/DIV+AD4- +ADw-P+AD4APA-FONT face+AD0-Arial size+AD0-2+AD4APA-/FONT+AD4AJg-nbsp+ADsAPA-/P+AD4- +ADw-DIV+AD4AJg-nbsp+ADsAPA-/DIV+AD4- +ADw-P class+AD0-MsoNormal style+AD0AIg-mso-margin-bottom-alt: auto+ACIAPgA8-SPAN style+AD0AIg-FONT-SIZE: 8pt+ADs- COLOR: black+ADs- FONT-FAMILY: Arial+ACIAPg-Test Engineering, Inc. is dedicated to Customer Service and welcomes your feedback.+ACY-nbsp+ADs- Please visit +ADw-A href+AD0AIg-http://tei-net.com/contactus.asp+ACIAPg-http://tei-net.com/contactus.asp+ADw-/A+AD4- to send us comments.+ACY-nbsp+ADs- We thank you for your time.+ADw-/SPAN+AD4APA-SPAN style+AD0AIg-FONT-SIZE: 10pt+ADs- COLOR: +ACM-ffffcc+ADs- FONT-FAMILY: Helvetica+ACIAPgA8-/P+AD4- +ADw-P class+AD0-MsoNormal style+AD0AIg-mso-margin-bottom-alt: auto+ACIAPgA8-SPAN style+AD0AIg-FONT-SIZE: 8pt+ADs- COLOR: black+ADs- FONT-FAMILY: Arial+ACIAPg-This e-mail may contain confidential or privileged information, if you are not the intended recipient, or the person responsible for delivering the message to the intended recipient, +ADw-SPAN class+AD0-GramE+AD4-then+ADw-/SPAN+AD4- please notify us by return e-mail immediately. Should you have received this e-mail in error then you should not copy this for any purpose nor disclose its contents to any other person. +ADw-/SPAN+AD4APA-SPAN style+AD0AIg-FONT-SIZE: 10pt+ADs- COLOR: +ACM-ffffcc+ADs- FONT-FAMILY: Helvetica+ACIAPgA8-/P+AD4APA-BR+AD4--- +ADw-BR+AD4-This message was scanned by ESVA and is believed to be clean. +ADw-BR+AD4APA-A href+AD0AIg-http://esva1.astmtmc.cmu.edu/cgi-bin/learn-msg.cgi?id+AD0-C87152801F.EF643+ACIAPg-Click here to report this message as spam.+ADw-/A+AD4- +ADw-/SPAN+AD4APA-/SPAN+AD4APA-/BODY+AD4APA-/HTML+AD4-