From: Jeff Clark Sent: Friday, May 07, 2010 11:24 AM To: Allison Rajakumar; Bill Larch; Bob Campbell; bcgw@chevron.com; cathy.devlin@aftonchemical.com; cca@lubrizol.com; charlie.passut@aftonchemical.com; Dan Pridemore; Greg Shank; James McCord; Jeff Clark; Jim Gutzwiller; James.Matasic@Lubrizol.com; jiam@chevron.com; jim.moritz@intertek.com; Jim Rutherford; xjc@luberdi.com.cn; joe.franklin@intertek.com; john.haegelin@intertek.com; Ken Goshorn; Mark Cooper; Mark Sutherland; Pat Fetterman; Perry Grosch; Philip Scinto; philipe.f.saad@cummins.com; Riccardo Conti; Ron Buck; ryan.johnson@swri.org; Scott Richards; shawn.whitacre@cummins.com; Steven Kennedy; Torreman, Marnix; vlkersey@ashland.com; luwt@ripp-sinopec.com; wvda@chevrontexaco.com; zbishop@tei-net.com Subject: Cummins SP Teleconference Minutes May 7 2010 Attendance - Jeff Clark, Mark Cooper, Zack Bishop, Bob Campbell, Jim Matasic, Philip Saad, Shawn Whitacre, Scott Richards, Jim Gutzwiller, Jim Moritz The main purpose of the call was to discuss whether or not the ISM test should be declared out of control per the March SP meeting action item. The data on new filters and crossheads was felt to be encouraging, but the panel understands the need to have the data from all four tests before determining for sure. General consensus was to keep moving forward (with no need to make an out-of-control declaration at this point) and meet the week of May 24th in San Antonio. Zack Bishop indicated that any labs that have kits that need the new hardware swapped out are to contact him. Best Regards, Jeff Clark Technical Manager Engineering / Analytical Services 412.365.1032 412.848.8843 cell ASTM Test Monitoring Center http://www.astmtmc.cmu.edu/ ATC European Registration Centre https://atc-erc.org